Mombasa Itinerary

 

Mombasa mission itinerary


Friday, 25 November 2022

·         Arrival in Mombasa

·         Settling in and unpacking

Saturday, 26 November 2022

·         Procurement of chain and rope

·         Opening meeting

o   Allocation of duties

o   Identification of measurement areas

o   Planning for the week

Sunday, 27 November 2022

·         Assembly of systems

·         Rolling and crimping of cable

·         Calibration and testing

·         Packing for Monday’s measurements

Monday, 28 November 2022

·         Beach measurements

o   North beach – Reef hotel to Mombasa harbour

§  Mombasa beach

§  Nyali beach

·         Port measurements

o   Drift stabilization issue

§  Negligible 40K peak to track

§  Need to include a 40K source on the boat to initially start the stabilization

§  Disabled stabilization for this round of measurements

o   4 lines (??) measured between Port Kilindini and Port Reitz

·         Daily debrief meeting

Tuesday, 29 November 2022

·         Beach measurements

o   Mtongwe beach next to Kilindini Harbour.

o   Beach team dropped off using the Coast Guard boat

·         Port measurements

o   Crossing/intersecting the lines measured on Monday from Port Kilindini to Port Reitz

·         Debrief meeting

Wednesday, 30 November 2022

·         Data analysis and plotting using GIS

·         Port measurements

o   Since it was high tide during the morning, measurements were done close to the shore.

o   Very shallow and muddy areas, close to the mangroves.

o   Boat and DUGS got entangled in a submerged fishing net and had to be cut loose.

o   The original DUGS buoy was lost – presumably it also got entangled in the fishing net. In order to continue measurements, a buoy from the boat was used. However, it was much larger than the original buoy and caused significant drag. There is also the risk that its buoyancy lifted the DUGS from the sediment.

o   Upon re-deployment, the rope from the buoy got twisted around the Ethernet cable causing a bend. While this did not prevent the days’ measurements to be completed, it did cause some damage to the cable sleeve.

·         Debrief meeting

Thursday, 1 December 2022

·         Beach measurements

o   Second measuring of north beach

§  Analysis showed that more measurement lines were needed along the northern beach for consistency and improved interpolation of data.

§  Also, the Trimble rugged tablet went into “sleep mode” during the first round of measurements and the area in front of Bahari Beach Hotel did not have any data, and should be re-measured.

·         Port measurements

o   First round measurements

§  The damage from the previous days’ measurements leaked water into cable and into the DUGS enclosure.

§  This leak created a short on the Ethernet port, preventing PoE injection and no power was delivered to the system.

§  Unable to perform measurements

§  The system therefore had to be opened, dried, and a new Ethernet port had to be crimped.

o    Second round of measurements

§  Using the “re-crimped” system, a second round of measurements were performed.

§  The aim was to measure the area of Port Reitz leading into the river Mwache, and to cover a portion of the river.

§  Unfortunately, this area was extremely muddy with a lot of mangroves, and the drag on the system was significant.

§  The DUGS fell stuck, and upon removal of the system from the muddy sediment, power was again lost.

§  Another leak in the cable was found and a lot of water made its way into the enclosure. This was exasperated by the excess water in the cable from the previous days’ damage to the cable sleeve.

§  A short was again created on the Ethernet port, but this time the MCA also showed water damage. Either the entire spectrum was pushed into lower channels, or excessive counts were measured. Unfortunately, these issues prevented further measurements.

·         Debrief meeting

·         Complete rebuilt of DUGS

o   The water damage forced an entire system rebuild. The MCA brought from South Africa was fitted to the system and a new, dry, Ethernet cable was fitted to the system.

o   The DC-DC converter was replaced along with a new Ethernet port for PoE injection.

Friday, 2 December 2022

·         The previous days’ data were analysed and plotted using GIS

·         Port measurements

o   It was decided to avoid shallow, muddy and mangrove areas to prevent the issues of previous days.

o   Measurements in Port Reitz were completed using the rebuilt DUGS system

o   Measurements were expanded to Kilindini harbour area and shipping channel

·         Debrief meeting

Saturday, 3 December 2022

·         Beach measurements

o   South beach

§  Shelly beach

·         All data were analysed and plotted using GIS

·         Debrief meeting

Sunday, 4 December 2022

·         Disassembly of systems

·         Sorting of equipment

·         Conclusion of project

·         Wrap-up meeting

·         Packing for Monday’s flight

·         Field trip

o   Dolphin safari from Shimoni jetty

o   Scuba and swimming

o   Lunch on Wasini island

Monday, 5 December 2022

·         Return to SA